Announcements:
Admissions Open! Join our February batches for UPSC & APSC preparation — limited seats available. Enroll now! +91 6901259799

Kaziranga Elevated Corridor Project: What is it? Features & Relevance

mins read
4

Table of Contents

Kaziranga Elevated Corridor Project

One of the most significant infrastructure projects Assam has seen recently is the Kaziranga Elevated Corridor Project. This initiative, which is expected to cost ₹6,950 crore, aims to strike an equilibrium between environmental responsibility and development, particularly in one of India’s most important wildlife zones.
The Kaziranga Elevated Corridor Project integrates regional connection, flood management, wildlife preservation, and highway extension. For APSC CCE, UPSC CSE, and other competitive exams, it is quite important. Topics like infrastructure, environment, biodiversity conservation, and sustainable development are all related to it.

For expert guidance, UPSC & APSC Coaching in Guwahati helps aspirants master current-affairs based topics like this project.

What was the news of Kaziranga Elevated Corridor?

The Indian Prime Minister performed the Bhoomi Pujan for the Kaziranga Elevated Corridor Project in Kaliabor, Assam, on January 18, 2026.

The project entails the 4-laning of National Highway-715’s Kaliabor–Numaligarh segment. The proposal has been approved by the Cabinet Committee on Economic Affairs. The EPC (Engineering, Procurement & Construction) approach will be used to carry out the project.

Crucially, this project has been described by experts as an illustration of both environmental sustainability and infrastructure development.

What is the Overview of the Kaziranga Elevated Corridor Project?

This section highlights the key Project Details:

  • Project Cost: ₹6,950 crore+
  • Highway: NH-715 (Kaliabor–Numaligarh stretch)
  • Total Length: 85.675 km
  • Execution Mode: EPC (Engineering, Procurement & Construction)
  • Approving Authority: CCEA
  • Major Greenfield Bypasses: Jakhalabandha (Nagaon district) and Bokakhat (Golaghat district).
  • Districts Covered: Nagaon, Karbi Anglong and Golaghat.

The purpose of this project is to transform a jammed and insecure highway stretch into a modern, wildlife-friendly infrastructure asset.

Why is the Kaziranga Elevated Corridor Necessary?

What are the existing Problems on NH-715?

The current Kaliabor–Numaligarh section of NH-715 is mostly two-lane. It passes through or along Kaziranga National Park and has a restricted Right of Way (16-32 metres). Moreover, this part of the National Highway suffers from poor road geometrics and congestion. As a result, traffic movement remains slow, unsafe, and environmentally disruptive.

Floods, Wildlife Movement, and Human-Animal Conflict:

Every year during the monsoon season, the Kaziranga National Park gets heavily flooded. As a result, wildlife moves towards the Karbi Anglong Hills, which lie on higher ground. It becomes necessary for animals to cross NH-715 to survive.

Consequently, this leads to high roadkill incidents, frequent human-wildlife conflict. It also increases risk for both animals and commuters. Moreover, continuous heavy traffic worsens the situation, making intervention unavoidable.

How the Kaziranga Elevated Corridor Solves These Problems?

The Kaziranga Elevated Corridor addresses these challenges through engineering design integrated with conservation goals.

Wildlife-Friendly Design:

  • A 34.5 km long elevated wildlife corridor allows animals to pass safely underneath.
  • Traditional animal migration routes remain undisturbed and it will reduce vehicle-animal interaction significantly.

Therefore, the project secures both biodiversity and human life.

What are the Environmental and Conservation Significances of Kaziranga Elevated Corridor Project?

  1. Protection of Animal Corridors:

The project safeguards traditional animal corridors used during floods and seasonal movement.

  1. Reduction in Roadkill and Conflict:

By separating wildlife movement from vehicular traffic, the corridor reduces roadkill. Moreover, it will also minimise human-wildlife conflict and enhance long-term ecological stability.

  1. Support to Flagship Species:

The project directly aids conservation of One-horned rhinoceros, Asian elephants and Royal Bengal tigers. Notably, Kaziranga National Park is a UNESCO World Heritage Site, making such conservation-focused infrastructure globally significant.

Connectivity and Economic Importance for Assam:

  1. Strengthening Upper Assam Connectivity:

The corridor improves connectivity to major economic centres such as Dibrugarh and Tinsukia. It also strengthens links with Arunachal Pradesh, improving regional integration.

  1. Boost to Tourism:

Kaziranga is one of India’s most visited wildlife destinations. Improved road infrastructure will enhance tourist safety, reduce travel time and encourage eco-tourism. As a result, the project supports both conservation and local livelihoods.

Kaziranga Elevated Corridor as a Model of Sustainable Development:

This project represents development with environmental responsibility, where:

  • Infrastructure growth does not compromise biodiversity.
  • Engineering solutions respect ecological realities.
  • Economic development aligns with conservation goals.

Thus, it offers a replicable model for future projects in ecologically sensitive regions.

A structured UPSC Exam Preparation strategy helps aspirants connect infrastructure and environment topics for better answers.

Conclusion: Why the Kaziranga Elevated Corridor Matters

The Kaziranga Elevated Corridor Project is not just a highway expansion. Instead, it is a landmark initiative that harmonises modern infrastructure development with wildlife conservation. By addressing flood-related animal movement, reducing roadkill and improving regional connectivity, the project strengthens Assam’s ecological and economic future.

For aspirants preparing for UPSC, APSC, and other government exams, this project offers a powerful real-world example of how policy, engineering, and environmental ethics can work together. Understanding it thoroughly will help candidates write high-quality answers, enrich essays, and perform confidently in interviews focused on sustainable development and biodiversity conservation.

Sources:

https://www.pib.gov.in/PressReleasePage.aspx?PRID=2215880&reg=3&lang=2

FAQ:

1. What is the Kaziranga Elevated Corridor Project?

The Kaziranga Elevated Corridor Project is a major infrastructure initiative in Assam. It involves 4-laning the Kaliabor–Numaligarh stretch of NH-715 with an elevated wildlife corridor to ensure safe animal movement and sustainable development near Kaziranga National Park.

2. Why is the Kaziranga Elevated Corridor important?

The project is important because it reduces roadkill and human–wildlife conflict. It supports flood-time animal migration and balances highway development with biodiversity conservation in an ecologically sensitive region.

3. What are the key features of the Kaziranga Elevated Corridor Project?

Key features include a 34.5 km long elevated wildlife corridor, project cost of ₹6,950 crore, coverage across Nagaon, Karbi Anglong, and Golaghat districts. It will be executed under the EPC mode approved by the Cabinet Committee on Economic Affairs.

4. Why is the Kaziranga Elevated Corridor Project relevant for UPSC and APSC exams?

The project is relevant for UPSC and APSC as it links infrastructure development, environmental protection, wildlife conservation, flood management, and sustainable development. All these make it an important topic for Prelims, Mains, and interviews.

SPM IAS Academy APSC UPSC foundation batch for working professionals with prelims, mains and interview coaching in Guwahati
upsc application form 2026
Featured
The UPSC Notification 2026 has been released. It is available on the official UPSC portal
UPSC Cadre Allocation Policy 2026
Featured
The UPSC Cadre Allocation Policy 2026 marks an important administrative reform by the Government of
UPSC EPFO result 2025 out. SPM IAS Academy
Featured
The Union Public Service Commission (UPSC) has officially declared the UPSC EPFO Result 2025 for
Featured
Use the UPSC photo resizer online tool below to resize photo for UPSC, compress to
Featured
Score in the optional paper can make a significant impact on your UPSC CSE Mains
IAS vs IPS Officer_ Key Differences in Roles, Responsibilities, and Salary in Indian Governance
Featured
When it comes to the civil services in India, the two most prestigious and sought-after
Call Now